On a recent site visit to a prospective client, who wanted a quote for their kitchen and bathroom installation, my husband who runs Random Task Plumbing asked what they were having and did they have any plans he could see. The client didn’t know what they wanted, other than for all the works to be completed by mid December, in time for Christmas. Bearing in mind that the client hadn’t yet exchanged contracts on the property and presently lived in another part of the country.

Firstly, a detailed quote is impossible to give if you only have a rough idea of what you want, or don’t know what you want at all. Also any tradesperson worth their salt, will have at least a 2 to 3 month lead time, especially leading up to Christmas. Whilst basic help and advice can be given to guide clients regarding types of showers suitable for their water systems and the feasibility  to move the loo to a different location (soil stacks are often forgotten by clients) and draw a scaled plan, most small tradespeople don’t have the time to offer a detailed design consultancy. The fixtures, fittings and finishings have to be chosen by you, the client. After all it’s your bathroom, kitchen etc. and it’s imperative that you love the finished results, it’s your home.

Bathroom Moodboard by designbykaty.com

Detailed Bathroom Moodboard by Designsbykaty.com

So before calling a tradespersons to quote, take time over your plans, keep revisiting them and show them to other people. Think about how you will use the space and how you want it to make you feel. If this is difficult for you, then an Interior Design consultancy is invaluable. For as little as £95.00 a design consultancy could save you a lot of time and possibly money too. Good interior design is about planning, not just about carefully coordinated fabric and paint swatches. This consultancy maybe all you need to set you off to implement yourself. If you require more help tailored to your specific needs, these can be accommodated too, regardless of budget. Of course everyone has budget.

First floor plans of a four bedroom house

You don’t need such detailed drawings unless major renovations are planned.

Interior Designers use local trade, craftspeople and suppliers and only recommend those whose work and people they trust. When deciding, look at reviews, ask to see previous completed work. Personality compatibility also is valuable – can you work with them?

I understand that you want everything ‘done’ and perfect for Christmas, but be realistic with your time scales. Even when you’ve decided on your plans, fixtures, fittings etc. There are supplier lead times to consider too. The last thing you want is a half-finished job over the festive season, especially if planning to have guests.

assembled cupboard carcass's

Kitchen install in progress not what you want at Christmas

After - Kitchen with island and glass partition wall and door to hall.

After – Kitchen with glass partition and door to hall

Once you have detailed plans, you can then invite local tradespeople to quote and provide approximate dates of availability. They will all be able to quote ‘from the same song sheet’, which makes price comparisons clearer. However, remember that cheaper isn’t always better, you often get what you pay for. Allow for a lead time on quotes being received too.

Tiling in progress in shower en-suite shower area

A half finished guest en-suite – not what you want when having guests

Completed Guest En- Suite

Completed Guest En- Suite

Plan the work in stages – what can be implemented and finished by your self-imposed Christmas deadline? Is this in the correct order of your work schedule? If so, fine. If not, then it’s far more beneficial to be patient and schedule the works for early in the New Year, thus eleviating the extra stress of Christmas and giving your home the consideration it deserves.

There’s  always next Christmas!


Preparing Your Home For Selling

For Sale/Sold Sign by Zazzle

How long will it take to sell your home?

Spring is a popular time to market and hopefully sell properties, and once that decision has been made, you contact your local agent for a valuation. Agents valuations are based on similar properties to yours currently sold or for sale in the area.

Now, if you’ve lived in your home for many years maybe it  has become a little ‘tired’ or dated’, but would rather sell ‘as is’. Possibly at a lower selling price and taking longer to sell, rather than face doing any work, spending money, in the hope that a DIY enthusiast will see the potential and relish the challenge, some do, many people don’t see the potential or want to undertake the work.

You can ask your agent (if your home is tired or dated) for two valuations – ‘as is’ and ‘tidied up’. Depending on the individual agent, they may advise that it’s not worth spending any money or the effort, as the return will not out weigh the costs involved. Or they may be happy to advise on both scenarios. If the agent offers both marketing prices, you can work out your parameters of what you would be prepared or need to spend for the ‘added value’ and make an informed decision on whether you should implement the improvements or not.

Kitchens and bathrooms are two of the biggest influences on a sale. The view often being, don’t change it, as whoever moves in will rip it out and put in new. Possibly, either straight away, in time, or just don’t want the expense and hassle. Again, compare the ‘added’ value’ and costs, this will help you make your decision. Think about your target market: who is likely to want to buy your home? What will they be looking for?

Front path and door of Victorian house

Ensure the front of your home looks promising.

Whether or not you intend to carry out any updating, your home should still be prepared and ready to market for great photographs for the internet, brochures and actual viewings. Cleaning, especially bathrooms and kitchens, de clutter, windows should sparkle. De-personalise by packing away personal items (well you’re moving aren’t you?) so prospective purchasers can see how their belongings will fit in or not. Don’t be precious, be objective and try to see the house as a commodity rather than your home. If you find this difficult, ask friends ( however they may not be totally honest with you) Estate Agent or Home Staging Professional for their view and recommendations. Refresh garden containers with seasonal plants to brighten up dull corners of your outside space.

Case Study – Before and After of a ground floor flat which I completed last year for marketing and selling. The flat had become outdated and ‘tired’. This was the hardest job I think I’ve ever carried out, the flat had belonged to my dear mother.

The target market was an older individual or couple, perhaps downsizing or retiring, who would probably want to move straight in and not have any or very much to do.

Living Room

Working with a neutral palette to create a cohesive look in a small flat, all the rooms, including the paint work was painted the same colour. A new cream carpet was laid throughout. In the living room the 1960’s fire-place and surround was replaced with a smaller contemporary model. Although excess furniture and personal effects have been removed, we re-used some of the existing furniture and rearranged its layout.


Unfortunately, I don’t have any pictures of the ‘before’, of the kitchen, but the units were dark brown wood, beige work top and beige speckled tiles with an occasional fruit or vegetable tile – a 1980’s throwback. The units were in good condition and the design layout worked ergonomically, it was just that it looked dated.  Painting the cabinets an off white, replacing the work top and changing the tiled splash back to white metro in brick style made the kitchen much brighter, more contemporary and up to date.

Guest Bedroom

The guest bedroom was originally very cramped and cluttered. By removing the shelves, wash basin and tiled splash back and a single bed more space was created. Freshly decorated walls and cupboards which were fitted with new knobs, and a new fitted carpet laid. Again,  some of the original furniture and accessories were re used during the bedroom re-design.

Main Bedroom

Main Bedroom. The textured wall paper was removed, and the walls and woodwork were repaired and freshly painted in the same colour as the rest of the flat. The curtains and track were removed, leaving just the blind. The  furniture layout was rearranged, excess furniture was removed, and some items from other rooms were introduced. A new carpet was laid.

Shower Room

Small shower room

Shower Room

Although this work was done prior to the staging of the flat, it would have been necessary to include refurbishing the bathroom. The original pink bathroom suite was replaced with a large 1200 mm walk in shower, with room for a stool if required. The walls were tiled to full height on all walls. A vanity basin provides storage.  Extra storage ( not seen) was provided by a tall cabinet. The adjacent toilet has the same wall tiles and an extra high toilet was installed.

By investing time and money the property increased in marketing value by £35,000 and sold very quickly. But do your own sums, it’s all in the numbers!

Images by Sarah Maidment Interiors, Sign by Zazzle, Front door by rhsblog.co.uk Pots by www.etthem.se

Renovation and Restoration of a 1930’s House Before and After Pictures

I have now compiled ‘before and after’ pictures, with the occasional ‘during’ photo (remember it always gets worse before it gets better) which I hope you’ll enjoy and give you momentum to commence or  finish your projects.

The renovation and restoration of a 1930’s house is finished! Are you ever finished in a home? Probably not.

Front Elevation

Before – Sad and neglected                                        After – Restored and extended


Before - The original 1930s' entrance hall prior to renovations.

Before – The original front entrance hall prior to renovations.

Original 1930's entrance hall

Before – The original hall was dark and poky.

Acro props before steel beam is installed

During an internal hall wall removal.


After - The finished entrance hall in a 1930's house

After – The completed entrance hall

Sitting Room

Before - The sitting room with the original 1930's brick fireplace.

Before – The sitting room with the original 1930s’ brick fireplace.

After - The original 1930's brick fireplace cleaned up

After – The original 1930’s brick fireplace was retained, so too were the original Crittal French doors.

Before Original 1930's sitting room complete with Crittal French doors and brick fireplace

Before – A 1930’s sitting room with original Crittal French doors and brick fireplace.


Before - The original 1930's dining room

Before – The original 1930’s dining room

During - The wall dividing the kitchen and dining room has been removed.

The dividing wall between the kitchen and dining room has been removed, to be re-positioned.

After - the completed new kitchen

After – The completed kitchen

After - Kitchen with island and glass partition wall and door to hall.

After – Kitchen with glass partition and door to hall. Original servants bell box is re-hung – shame no staff though!

Open plan kitchen/diner/day room with bi-fold doors onto garden.

View into dining/ day room area from kitchen

Before- original 1930s' dining room

Before- the original dining room prior extension and renovation work – damp wall is now where clock is hung.

Living Room

Rear Footings 3rd feb 2015

Before – Laying the foundations

Painted Stove and Fireplace

During – Marking the wall for the multi-fuel stove

Trescotte Sitting Room Afer 073

After – The finished sitting room

Family Bathroom

Before- A tired and dated bedroom                         After – A family bathroom

Master Bedroom

Master Bedroom during construction

The first fix electrics in the master bedroom

After - Large master bedroom with Heals four poster bed

After – The finished master bedroom

master bedroom with four poster bed from Heals

After – The large master bedroom complete with a four-poster bed from Heals.

The Loo

Before with original cistern          After – Re-sited and restored cistern

Guest Bedroom

Originally a landing with airing cupboard, bathroom with separate loo. Now a guest bedroom, painted in ‘Setting Plaster’ Farrow and Ball http://www.farrow-ball.com/setting%20plaster/colours/farrow-ball/fcp-product/100231

Rear Elevation

Before – An overgrown garden                           Waiting to mature!

However carefully one plans either a renovation or restoration project, it rarely comes in on budget – it’s usually over budget. This is not just because of unforeseen problems like discovering structural problems once the work has commenced, it can due to adding a few extra plug sockets here and there (it all adds up) or choosing high specification kitchen, bathrooms and fittings. Usually it’s because we’ve under estimated the basic build/renovation costs – raw materials labour plus VAT.  Comparing your projected budget spread sheet to the actual costs spreadsheet, helps analyse where you under budgeted or over spent.

Did we go over budget? Yes, we knew we’d go over budget when we decided to install the Sonas system. However, the original quote was less than the final invoice due to the time-lapse between the first fix and completion – the labour and equipment had increased in price. The quote was valid for 30 days only, lesson learned.  The building material costs were higher too, despite having a breakdown of these costs from the supplier which our budget spreadsheet was based upon. Generally, the majority of people under-estimate their expenditure.

With the uncertainty of property the market, and the impact Brexit may have, many home owners are opting to improve their current home instead of moving. Having had nearly forty years experience in renovating properties, although home values may dip from time to time, they always go up, and on the whole a good investment.

If you think I can be of benefit to you and your project, whether big or small just contact me.

Floor tiles on cloakroom floor     http://www.firedearth.com/tiles/range/patisserie/sucre-1 and entrance floor  http://www.firedearth.com/tiles/range/casino-floor/mode/grid

Artwork by Kim Major George  http://www.majorgeorge.co.uk/



Renovation and Restoration of a 1930’s House – Don’t You Just Love Technology?


Sonas System image via Pinterest

Sonos System

It was suggested, prior to the first fix electrics to install a Sonos music system.  After much thought and discussion about going over our original budget, we decided it would be a good idea. TV and internet ports were also installed in some bedrooms as well as the living areas, the idea being that family members could use the internet independently to stream films, games etc.  Our electrician laid all the cables and the builders left gaps in the ceiling ready for the speakers. The mass of wires leading back to a cupboard where the system will be controlled from. The installers of the Sonos System wanted the house to be virtually dust free before fitting.

Ceiling Speaker

An unobtrusive ceiling speaker

Sounds good, and so far so good, until we came to install a phone line and broadband. An internet search of post code speeds and providers showed lots of options and costs too, including BT Infinity, Sky Fibre Unlimited, EE and TalkTalk. BT Infinity showed the estimated speed at 22.8 – 38Mb. As a current BT customer I organised the contract and booked in an installation date. However, when reading through the info received BT had estimated the broadband speed at 1Mb – 4Mb. This is a huge difference, especially when streaming films, downloading computer games and music. I questioned BT about the speed, and they explained that half the village did indeed have fibre optic cable, but my house is in the half that doesn’t; and they had no plans in the foreseeable future to install the other half. So we have all the technology wired in, but inadequate broad band service to actually run it all at the same time.

Broad Band Speeds for your area can be found in the internet

Broad Band speeds for our post code found on the Internet

A neighbour came by just by chance with some information about a company who provide a better broadband speed of up to 40Mb. He had just set up an account and had the system installed, due to his frustration with BT. This sounded promising.

The system works via EE’s 4G mobile network. The company will install an external antenna which connects to a 4G modem and allows for both wired and WIFI access through EE. It is also possible to move your current landline number to an internet based phone system, removing the need for a BT landline. The cost of this phone system is £2.50 a month line rental and 1.2p per minute for calls. A typical cost for the installation is £799.00, plus system interface and configuration charges plus plugs, plus plus….. But then we may save on call charges etc.

Two contracts are offered, either a 30 day rolling contract offering 15GB for £20.00 or 25GB for £30.00 per month. Or 24 month contract at £28.00 a month for 25 GB or 50GB at £55.00. Checking our current average monthly data usage (currently unlimited) this was insufficient for our needs. The maximum for a consumer available is 50GB a month, but we can add more at £15.00 for 10GB. The company didn’t specify whether that was £15.00 for each additional 10GB on top, but guessing it is. This makes a huge difference to the cost. If your usage comes within 50GB, then it’s sounds like a great system in rural and not so rural areas. Anywhere in fact BT haven’t bothered to install sufficient fibre optic cable, despite the Government promises!

So where does that leave us? Well, with BT, as there appears to be little else we can do.  Unfortunately, BT failed to turn up at the appointed time and date. Neither did they call or text to say they weren’t coming. For a communications company their communication skills are shocking. So back to the buffering and waiting for things to down load. Don’t you just love technology?

Selecting tiles for kitchen

‘Mood Board’ of tiles and work top

The work top in the kitchen has been installed by a local stone supplier, who have a huge range and choice of materials and colours to choose from. They also template and fit the work tops. I was lucky enough to find an off cut of Silestone which was suitable, and therefore a little cheaper. Silestone is a composite stone, offering hardwearing capabilities, and is less expensive than granite. Again shop around as prices vary enormously between suppliers. I have chosen to tile the splash back rather than have an upstand, to make the space more cohesive. I didn’t want an upstand with a tiled or glass backing behind the hob, which would break up the run above the work top.