Want It Done By Christmas?

On a recent site visit to a prospective client, who wanted a quote for their kitchen and bathroom installation, my husband who runs Random Task Plumbing asked what they were having and did they have any plans he could see. The client didn’t know what they wanted, other than for all the works to be completed by mid December, in time for Christmas. Bearing in mind that the client hadn’t yet exchanged contracts on the property and presently lived in another part of the country.

Firstly, a detailed quote is impossible to give if you only have a rough idea of what you want, or don’t know what you want at all. Also any tradesperson worth their salt, will have at least a 2 to 3 month lead time, especially leading up to Christmas. Whilst basic help and advice can be given to guide clients regarding types of showers suitable for their water systems and the feasibility  to move the loo to a different location (soil stacks are often forgotten by clients) and draw a scaled plan, most small tradespeople don’t have the time to offer a detailed design consultancy. The fixtures, fittings and finishings have to be chosen by you, the client. After all it’s your bathroom, kitchen etc. and it’s imperative that you love the finished results, it’s your home.

Bathroom Moodboard by designbykaty.com

Detailed Bathroom Moodboard by Designsbykaty.com

So before calling a tradespersons to quote, take time over your plans, keep revisiting them and show them to other people. Think about how you will use the space and how you want it to make you feel. If this is difficult for you, then an Interior Design consultancy is invaluable. For as little as £95.00 a design consultancy could save you a lot of time and possibly money too. Good interior design is about planning, not just about carefully coordinated fabric and paint swatches. This consultancy maybe all you need to set you off to implement yourself. If you require more help tailored to your specific needs, these can be accommodated too, regardless of budget. Of course everyone has budget.

First floor plans of a four bedroom house

You don’t need such detailed drawings unless major renovations are planned.

Interior Designers use local trade, craftspeople and suppliers and only recommend those whose work and people they trust. When deciding, look at reviews, ask to see previous completed work. Personality compatibility also is valuable – can you work with them?

I understand that you want everything ‘done’ and perfect for Christmas, but be realistic with your time scales. Even when you’ve decided on your plans, fixtures, fittings etc. There are supplier lead times to consider too. The last thing you want is a half-finished job over the festive season, especially if planning to have guests.

assembled cupboard carcass's

Kitchen install in progress not what you want at Christmas

After - Kitchen with island and glass partition wall and door to hall.

After – Kitchen with glass partition and door to hall

Once you have detailed plans, you can then invite local tradespeople to quote and provide approximate dates of availability. They will all be able to quote ‘from the same song sheet’, which makes price comparisons clearer. However, remember that cheaper isn’t always better, you often get what you pay for. Allow for a lead time on quotes being received too.

Tiling in progress in shower en-suite shower area

A half finished guest en-suite – not what you want when having guests

Completed Guest En- Suite

Completed Guest En- Suite

Plan the work in stages – what can be implemented and finished by your self-imposed Christmas deadline? Is this in the correct order of your work schedule? If so, fine. If not, then it’s far more beneficial to be patient and schedule the works for early in the New Year, thus eleviating the extra stress of Christmas and giving your home the consideration it deserves.

There’s  always next Christmas!

 